AI Data Center Landscape — Sprocket Networks Opportunity Map
North Texas, West Texas corridor & statewide · Board briefing — Digital Alpha · Data current Jun 16, 2026
Map View
Category (filter)
Status (filter)
Infrastructure
Fiber corridor opportunity
Sprocket FWF transport network
DC interconnect (dark-fiber reach)
Potential fiber build
On-net — rides Sprocket plant
IRU candidate — Zayo conduit avail
Build owned — greenfield
Power substations
Oncor (confirmed) — 96
Likely Oncor (untagged) — 564
Co-op / municipal / other — 59
Larger square = transmission. 10 metroplex counties. Source: OpenStreetMap (Oncor is the dominant TDU here; untagged subs are likely Oncor, unverified).
Hover or click a substation for its estimated MW (transmission = bulk throughput, distribution = load served) — inferred from voltage class, calibrated to Oncor's ~635 MW Irving peak. This estimates substation scale, not spare/available capacity: provisioned ≠ available once N-1 contingency, peak-day reserves, and queued loads are accounted for. Real headroom requires an Oncor will-serve study (in progress). Estimates, not metered.
About this map
Sprocket FW + Dallas routes are actual build geometry. DC marker size scales with planned capacity; corridor sites are geocoded from public addresses, approximate where only a county is known.